Business
Information in
Hiroshima

Search

Site Search

Support
Font Size
Default
Enlarge
Japanese

Search Results-Detail

Last updated : 04/01/2020

The Chugoku Electric Mfg. Co., Inc.

President
Makoto IWAMURO (Mr.)
Year established
1962
Capital
150,000,000 yen
Sales
10,802,060,000 yen
Employees
400
Postal (zip) code
732-8564
Company address
4-4-32 Ozu, Minami-ku, Hiroshima-shi
Phone
082-286-3411
Fax
082-286-3458
URL
http://chuki.jp/
Company PR

Our company was founded in 1938. The management was changed from a wholly-owned subsidiary of The Chugoku Electric Power Co.,Inc. into a joint management structure with DAIHEN Corporation (July 1, 2015). We manufacture and sell electric power equipments such as transformers and various types of control equipments. We provide low-cost and high-quality products by promoting improvement in quality and management efficiency with the aim of expanding sales in general industrial fields.

写真1

We are creating new products in line with our customer's needs, such as low-noise large transformers, environmentally conscious products, and oil-feed water cooling systems for use in building basements.

写真2

This is a sub station for consumers that takes into consideration landscaping and environmental factors.

写真3

It lowers the voltage by connecting "SSR " within a system interconnection facility where a distributed power supply is connected to.

Major Products
Electrical power equipment (various types of transformers, underground distribution equipment, instrument transformer current transformer)
Control system equipment (electrical distribution panel boards, flicker control system, automatic control system)
Electronic system equipment (remote monitoring and control system)
Construction work at plants (design, construct, and maintenance substations and transforming systems)
Major Customers
The Chugoku Electric Power Co., Inc.
Chudenko Corp.
Setouchi Joint Thermal Power Co.,LTD.
Major Facilities/Equipment
Transformer production equipment 1
 Machines for core cutting, assembly for small to large transformers, coil winding, can manufacturing/painting, etc.
Withstand voltage test equipment 1
 Impulse voltage generator: 1000 kV, 100 kJ, withstand voltage test equipment: 300 kV, 600 kVA
Equipment for automatic testing of small size transformers 1. (Testing capacity: 200 units /day)
 Conducts various tests automatically on 6 kV, DMT, Pole mouneed 100kVA, Automatic test device for 1φ5 - 50kVA small transformer.
Printed Circuit Board Assembly production equipment 1
 Automatic soldering machines, automatic washing device. (Maximum: 400 × 400 mm. 150 pieces/day)
Walk-in Type Temperature & Humidity Chamber 1
 Environmental testing chamber of -20 - + 65 ℃, 30 - 95%rh.
Internal dimensions: W3.2 × D2 × H2.8 m
Technology Employed
Electric machinery/equipment manufacturing industry
We have extensive experience in the delivery of large, medium and small transformers up to 110 kV and 100 MVA, and large mobile transformer truck.
Electric machinery/equipment manufacturing industry
We have extensive experience in the design, construction, and maintenance of power receiving and substation facilities for buildings, plants, etc.
Electric machinery/equipment manufacturing industry
We have extensive experience in the delivery of devices to measure and prevent high harmonics and flickers that are generated at the power sources at plants.
Electric machinery/equipment manufacturing industry
Designs circuits for automatic control boards, etc. on CAD and creates CAM data for wiring work automatically.
Electric machinery/equipment manufacturing industry
We have extensive experience in analyzing gas and furfural in the insulating oil in transformers to detect troubles and predict the remainder of their service life.
Information-communication machinery/equipment manufacturing industry
We have highly reliable and quality designing and production technology that is corresponding to specifications of power companies.
Information-communication machinery/equipment manufacturing industry
We have extensive experience in the delivery of centralized monitoring and control systems for power plants and substations, automated power distribution system, etc.
Primary Area of Technical Expertise

In order to meet the needs and expectations of our customers, taking advantage of the technology know-how that has been cultivated While engaged in electrical energy since our foundation, we provide products which you can use with safety, and services by offering a total system from consultation to aftercare.

Future Business Challenges
Trace PCB detoxification for a large transformer

To the top of the page